About this item
A safety switch beside each rooftop unit lets technicians cut power before servicing it. Code requires one at every unit, so there are five.
From the drawings
Unit-mounted disconnect for each rooftop unit.
Needed for the building: 5 each
One per RTU.
The price is an estimate. Drawing reference: MEP set, M-5 (HVAC schedule).
How your gift is used
Your contribution goes toward buying this item for the masjid building project. It is delivered and installed on site, and the office confirms every gift.